Peace of Mind / Beach deck

A place to
meet the ocean.

A coastal walkway and terrace, planned around a seamless entrance, warm finishes and an open view.

P01 · Preliminary design · Site engineering pending

Selected beach deck concept with warm decking, a stucco terrace face and oceanfront access
Selected design directionConcept rendering
Walkway38′ × 4′152 square feet
Main deck20′ × 9′180 square feet
Combined footprint332 sq. ft.Gross area, before any overlap
The connectionFlush entryNo step at the defined junction

Dimensions are user-provided. Site arrangement, elevations, foundations and structural sizes are not yet engineered. This guide is not for construction or permit submission.

01 / The design

Keep the view.
Refine the experience.

A continuous terrace, a warm taupe surface and a clean stucco face. The existing slope and access route guide the next stage of design.

01

An easy transition

Match the finished surfaces at a defined entrance. The connection elevation still needs to be surveyed.

02

A calm material palette

Composite decking, a stucco finish and a coordinated metal guard system.

03

Grounded in the actual site

Resolve the hillside, upper wall and shoreline conditions before setting the foundation layout.

02 / The plan

Two components.
One coastal experience.

Explore the confirmed dimensions. These are separate component footprints; their position and connection are still to be established on the site survey.

Nominal component footprints Diagrammatic arrangement

Walkway and deck dimensionsA 38 foot by 4 foot walkway and separate 20 foot by 9 foot deck drawn at the same relative scale. The site connection is not shown. 38′–0″20′–0″4′–0″9′–0″ WALKWAY152 sq. ft.MAIN DECK180 sq. ft.Relative placementand junction pending.

Written dimensions govern this concept. Confirm field measurements and subtract any overlap at the junction.

38′ × 4′

The coastal approach

A 152-square-foot walkway following the intended access route. Confirm whether the 38 feet is horizontal length or distance along the slope.

Field check: establish clear walking width, endpoint elevations and the deck junction.

Entry detailApproachDeck

Same finished elevation at the selected connection. Joint, support and drainage details need design.

Current scope: The lower 20-foot path previously discussed, stairs and landings are additional scope pending confirmation.

03 / The build sequence

From site understanding
to the final detail.

A planning sequence for the project team. Construction begins after the site-specific design and required approvals are complete.

Stage 01 / Establish the site

Set the footprint.
Understand the ground.

Locate the deck and walkway on a survey, establish the flush-entry elevation and resolve the engineering and approval path.

  • Confirm address, boundaries and prior permits.
  • Survey the wall, hillside, access route and connection levels.
  • Obtain geotechnical recommendations and the structural design.
Required outcome

An approved site-specific design with a defined footprint, elevations and inspection requirements.

Related drawing: S1.0

04 / Materials & quantities

Warm finishes.
Site-specific structure.

A starting point for selections and pricing. Structural materials and quantities will follow the completed engineering.

Capped composite decking

Trex Transcend Lineage in Biscayne is the proposed warm taupe finish. Confirm the sample and board profile.

View proposed product
Proposed

316 stainless assemblies

Compatible connectors, fasteners and anchors, with exact models and capacities selected for the design.

To specify

Stucco terrace finish

A drained exterior cladding assembly. Backing, weight and inspection access need detailing; any retaining wall needs its own design.

Proposed

Frame & guard system

Treated structural timber is the pricing candidate. Member sizes, bracing, guards and corrosion specifications remain to be designed.

Engineering

05 / The project budget

A clear starting
budget.

A preliminary cost plan for the 38′ × 4′ walkway and 20′ × 9′ deck: 332 square feet gross, with a flush entrance.

Preliminary installed-cost allowances · November 16, 2026
ScopeAllowance
Survey, soils investigation, structural plans & routine permit fees$15,000
Demolition & removal within the project footprint$6,000
Restricted-access mobilization, material handling & temporary protection$6,000
New foundations Excavation, reinforcement, concrete & placement · provisional allowance$25,000
Structural framing, bracing & corrosion-resistant connections$15,000
Composite decking, fasteners & installation$9,000
Marine-exposure guardrails & handrails$25,000
Stucco fascia assembly, flashing & drainage details$8,000
Basic lighting allowance & final cleanup$2,000
Subtotal$111,000
Contingency 15% of the full subtotal$16,650
Estimated total$127,650

Construction allowances include labor, materials, ordinary delivery, material sales tax, and contractor overhead/profit. No separate development-management fee is included.

Pricing basis

Built around this site.

Assumes San Diego coastal pricing, new foundations and framing, composite decking, marine-exposure railings, a drained stucco fascia finish and a flush entrance. The gross surface area assumes the two components do not overlap.

The railing allowance anticipates roughly 110–130 linear feet, depending on the final layout. Both long sides of the walkway alone total 76 linear feet. The required guard layout and corrosion specification remain to be designed.

The principal unknown

Foundations need a site-specific bid.

The $25,000 foundation allowance must be replaced with a contractor bid after the soils investigation and structural design. The P01 drawings do not establish the number of pillars, their depths or the concrete quantity.

Confirm the address, foundation design, railing layout and lower-walkway/stair scope before committing to a fixed construction price.

What is excluded from this budget
  • The additional 20-foot lower walkway, new stairs and landings.
  • Major retaining-wall work, bluff stabilization or shoreline protection.
  • Unusually deep foundations, extensive shoring or major rock excavation.
  • Furniture, landscaping, and extensive coastal entitlement or environmental studies.

Pricing context: Viewrail railing pricing and San Diego hillside cost guidance. These are market references; the allowances above are project planning estimates, not supplier quotations. The original P01 drawing set remains unchanged.

06 / The drawing set

Six sheets.
A shared starting point.

Browse all six sheets of the P01 planning set below. Select a sheet and enlarge it to read the notes.

Preliminary design coordination only. Not for construction, permit submission or structural procurement. The set contains no completed structural calculations or certification.

The next design milestone

Bring the site into focus.

01

Address & survey

Confirm the jurisdiction, boundaries, actual slope and connection elevations.

02

Soils & existing wall

Establish foundation recommendations and the effect of work near the upper patio wall.

03

Engineering & approvals

Complete the support layout, member and connection design, quantities and required approvals.